OVERVIEW:
Alfred State College worked with the New York Power Authority (NYPA) to fund a multi-year program. Stark completed an Energy Master Plan that transitioned into a capital project on the main campus, totaling $3.2 million in projects.

SOLUTION:
A multi-phase capital program including:

  • Chiller System Replacement
  • Energy Recovery System
  • Variable Refrigerant Flow
  • Demand Control Ventilation
  • Kitchen Exhaust Controls
  • Building Automation System Upgrade
  • Utility metering
  • Exterior lighting

RESULTS:
The college averages $125,000 annual savings in operational costs.